Please note that the renovation works are progressing well. The pitch construction is complete and maintenance is ongoing.
- The drainage works for the pitch and running track are ongoing in preparation for the laying of the running track.
- The dressing rooms works are going on. Two are complete.
- The VVIP seating area surface is being prepared (terrazzo) for installation of seats.
- Final touches on gangways in the spectator stands going on following completion of installation of spectator seats.
- The access gates are now ready for the installation of turnstiles for electronic access control. Mandela National Stadium will be ready to host the National Team(s) this year.